Paver Patio Part Deux

Image
 This project is taking almost a month.  I dug out the top layer of dirt, down about 6 inches.  I wanted to dig only 3 inches, but it became obvious while digging I needed to go deeper to get to some solid ground.   Once I had all the dirt out, I figured out I needed about 2.5 (cubic) yards of aggregate to fill back in 3 inches.   I had Chicagoland Materials deliver the aggregate and torpedo sand by dump truck to the alley.  I poured the first layer of aggregate into the patio area and used a Wagner compactor rented from Sunbelt Rentals to firm up the base.   The weekly rental price for the compactor was half the price of what Home Depot wanted.  I used gas pipes to lay down and flatten the 2nd layer of aggregate and the top level of sand above that.   Once the sand layer was down, I put down the Gator Base panels.  Much more about laying the pavers in  I'm going to go on a diatribe here about the Gator Base p...