roofing (contract) settled

After some back and forth with the roofer, I was able to get a credit for the roof board.  I also gave him some extra $$ for the new clay coping tiles for the parapet wall.  Everything was worked out in the end.  Lesson learned is to go through the contract line by line before the work starts so there's no confusion.

Comments

Popular posts from this blog

Up on the Roof, Down goes the old

Nip and tuck

2nd floor windows and move-in