On the Straight and Narrow

DS Construction finished the gang-way sidewalk yesterday.  Its quite a change of the old one which was tilted toward the neighbors property, and had large gaps between the sidewalk and building. 

Finished sidewalk as of this morning, curing!

First drop of concrete from Prairie Material.

Concrete form, right on property line.  Neighbor fence will be adjacent to concrete on neighbor property.

Retaining wall form for 3 steps down, under the bay window.

Comments

Popular posts from this blog

Chevy HHR water leak passenger floor, HVAC fan dead

Paver Patio Part Deux

1st phase new front porch